A complete new floor installation to Mercedes-Benz UK’s main head office building in Tongwell, Milton Keynes. Working with the appointed main contractor, Volker Fitzpatrick who removed the existing floor finish, Elite Tiling have carried out extensive tiling works, including all floor preparation works incorporating a full Ardex DPM and latex levelling specification.
With all phased works carried out during evenings and weekends to allow Mercedes-Benz to continue with normal operations, Elite Tiling completed over 1400m2 of floor tiling, to MBUK’s new corporate specification, to the main atrium, cafe and showroom floor areas.
Elite Tiling also supplied and fitted entrance matting to main entrances & revolving doors.
Floor Tiles: 600 x 600 Natural Finish Porcelain
Floor preparation: Ardex NA Latex, Ardex P82 Epoxy Primer, Ardex DPM
Adhesive & Grout: Ardex X77 and Ardex Flex FS
Expansion Trims: Schluter Dilex EKSN Stainless Steel
Over 1400m2 of floor tiling completed throughout
Main Contractor: Volker Fitzpatrick
Architect: Bickerdike Allen Partners
Project Completed: July 2011